Aerial view rendering of the eight-lane immersed tube tunnel favoured by Metro Vancouver’s board of directors to replace the aging George Massey Tunnel. (Province of British Columbia image)

B.C. VOTES 2020: We’ll build Massey bridge, B.C. Liberals say

NDP to decide on bridge or tunnel by the end of 2020

A bridge to replace the fragile, congested George Massey Tunnel under the Fraser River can be restarted soon after the Oct. 24 B.C. election, without lengthy environmental studies and a likely court challenge to the proposed twin tunnel plan, B.C. Liberal leader Andrew Wilkinson says.

Wilkinson and Richmond-Queensborough candidate Jas Johal announced at a campaign event Oct. 5 that the Massey bridge project would be part of an $8 billion infrastructure package to help B.C.’s economy recover from the COVID-19 pandemic. The cost of the bridge has risen since the NDP cancelled the project in 2017 and embarked on a study of an eight-lane tunnel option instead.

NDP leader John Horgan’s sudden election call is the latest delay for the project, halting work on a business case for a new crossing that still includes an eight to 10-lane bridge as well as the twin tunnel option favoured by Metro Vancouver municipalities.

The bridge project was halted with six kilometres of sand preload in place for the approaches and $95 million spent on assessment, design and consultation, Wilkinson said. He gave no estimate of how much the cost has risen and would only say it would be open to traffic “as soon as possible.”

“The worst possible thing you can do is to drive a great big tunnel under the river,” Wilkinson said.

NDP leader John Horgan’s sudden election call is the latest delay for the project, halting work on a business case for a new crossing that still includes an eight to 10-lane bridge as well as the twin tunnel option favoured by Metro Vancouver municipalities.

Speaking on behalf of the NDP, Delta North candidate Ravi Kahlon acknowledged that three years after cancelling the original bridge project, his government has not yet approved a design or decided between a bridge and a tunnel. That decision will come by the end of the year, he said.

RELATED: Massey crossing business study halted for snap election

RELATED: Pattullo bridge gets priority, union-only construction deal

Wilkinson said the Massey bridge would be built without tolls, mindful of the removal of tolls from the Port Mann and Golden Ears bridges that proved popular in Maple Ridge and Surrey where both parties are campaigning feverishly for the Oct. 24 election.

The B.C. Liberal government had a contract for $2.4 billion to build the Massey bridge, replacing a tunnel put in the river more than 60 years ago and now considered at risk in an earthquake. The B.C. Liberals say a new bridge will be financed out of an $8 billion “Rebuild B.C.” fund, which is in addition to existing infrastructure plans including the Langley and Vancouver rapid transit extensions now in progress.

The tunnel option could mean a delay of up to 10 years in getting a new crossing ready for use, since the Tsawwassen First Nation has opposed the plan and would likely challenge it in court due to the impact of dredging the river on Fraser River salmon, Wilkinson said. At a minimum, the tunnel option triggers a federal environmental assessment of the fish habitat impact, and if approved, the dredging and relocation of thousands of tonnes of salt-contaminated river bottom soil to create a trench for the twin tunnels.

Just before the announcement, the NDP campaign issued a statement claiming the switch would “risk major delays, risk losing federal funding and set the project back years.” Kahlon said he doesn’t know how lonh a federal fisheries review of tunnel dredging and construction would take, but the previously approved bridge would “turn Richmond into a parking lot.”


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC politicsBC Votes 2020

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Doug Routley of the NDP is relaxed after learning he’d won a fifth term as MLA. (Photo submitted)
NDP dominance continues in Nanaimo-North Cowichan with Routley’s reelection

Runner-up Istace enthused about the rise of the Greens in the riding and the province

Municipality of North Cowichan.
Public engagement demonstrates lingering concerns over emissions reduction targets

Chemainus grads’ 2020 prom venue restricted to four events next year

Doug Routley has retained his seat as Nanaimo-North Cowichan MLA. (Photo submitted)
Routley retains his post as Nanaimo-North Cowichan MLA

NDP stronghold in the riding continues despite a strong challenge from the Greens’ Istace

NDP headquarters on election night, Oct. 24, 2020. (Katya Slepian/Black Press Media)
ELECTION 2020: Live blog from B.C. party headquarters

BC NDP projected to win majority government – but celebrations will look different this election

B.C. Green Party leader Sonia Furstenau outlines her party's climate action platform at Nanaimo's Vancouver Island Conference Centre earlier this month. (News Bulletin file photo)
Green leader Furstenau declared victor in her home riding on Vancouver Island

Cowichan Valley voters elect freshly minted party leader for her second term

NDP Leader John Horgan celebrates his election win in the British Columbia provincial election in downtown Vancouver, B.C., Saturday, Oct. 24, 2020. THE CANADIAN PRESS/Jonathan Hayward
Horgan celebrates projected majority NDP government, but no deadline for $1,000 deposit

Premier-elect says majority government will allow him to tackle issues across all of B.C.

B.C. Liberal Leader Andrew Wilkinson speaks during a drive-in car rally campaign stop at a tour bus operator, in Delta, Saturday, Oct. 17, 2020. THE CANADIAN PRESS/Darryl Dyck
Andrew Wilkinson stepping down as B.C. Liberal leader

Will stay on until the next party leader is chosen

Harvesters participating in the extended commercial halibut season will need to land their catch in either Prince Rupert (pictured), Vancouver, or Port Hardy by Dec. 14. (File photo)
B.C.’s commercial halibut season extended three weeks

COVID-19 market disruptions at the root of DFO’s decision

Campbell River's new hospital, July 2018
Nurse diverts opiates and falsifies records at Campbell River Hospital

Nurse facing disciplinary action for moving opiates out of the hospital

Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

VicPD and B.C. Conservation Officer Service teamed up to free two bucks who were entangled in a fishing net and dragging a wheelbarrow sized piece of driftwood behind them. (VicPD)
VIDEO: Police, B.C. Conservation help two bucks caught in one fishing net

Bucks were also dragging a wheelbarrow sized piece of driftwood behind them

A heavy police presence was spotted in Lumby, Monday, Oct. 26, 2020. (Facebook)
Police situation leads to ‘hold and secure’ at North Okanagan school

Police call for social media blackout in ongoing incident

École de l’Anse-au-sable. (Google Maps)
COVID-19 outbreak forces closure of Kelowna school

The outbreak is the first within B.C.’s school system since classes resumed back in September

Most Read