Linemen install new power infrastructure in downtown Victoria. (Tom Fletcher/Black Press)

B.C. Hydro’s $5.5 billion in deferred debt puts pressure on rates

Auditor General says 29 accounts a complicated system

B.C. Hydro customers will have to pay off $5.5 billion in operating debt that has been pushed into the future to keep rates from spiking, and it’s not yet clear how the NDP government is going to tackle that.

Energy Minister Michelle Mungall’s initial effort to freeze rates was blocked by regulators, requiring a 3.5 per cent increase in 2017. Last year’s increase was another three per cent, similar to what the B.C. Liberal government had scheduled in its 10-year rate plan.

RELATED: B.C. Hydro freeze refused, rates go up 3% for 2018

RELATED: NDP looks for ways to rein in B.C. Hydro rates

In June of 2018, Mungall announced separate reviews of Hydro’s capital and operating debt, with outside experts to find a way forward, after the NDP government reluctantly decided to complete the $10 billion Site C project.

A key goal for Mungall is to return rate-setting to the B.C. Utilities Commission, after a series of directives from the previous government that drew accusations of political interference to make B.C. Hydro’s financial picture look better than it is.

On Wednesday, B.C. Auditor General Carol Bellringer released the latest report on B.C. Hydro’s deferred operating debt, which is separate from the billions in capital debt racked up for project such as Site C on the Peace River, the John Hart Dam reconstruction on Vancouver Island and the Ruskin dam and powerhouse rebuild in the Fraser Valley.

Deferring the bills of major storms and other unexpected spikes in operating costs is normal practice for utilities, Bellringer says. But B.C. Hydro’s network of 29 accounts is unusually complicated, with “rate smoothing” effects on future rates unclear.

In their response to Bellringer’s report, the ministry and B.C. Hydro emphasize that current customer rates are already on track to pay off 25 of the 29 deferral accounts.

Three that are not are the “customer crisis fund” account, the “Site C regulatory account” and the “rate smoothing regulatory account.”


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

Just Posted

North Cowichan/Duncan RCMP reports rise in calls for service

Increase of 4.6 per cent over same time last year

Chemainus Harvest House still demands attention in summer

Food bank supplies dwindle with diminished donations

Singers in a jam at Chemainus’ Waterwheel Park

Soul King Clarke joins the group for latest session

Mamma Mia! smashes Chemainus Theatre Festival ticket sales record

Total expected to surpass 30,000 tickets before the show ends on Aug. 31

Canco station opens in former Down Town auto site in Chemainus

Proprietor also operating a small convenience store

Rich the Vegan scoots across Canada for the animals

Rich Adams is riding his push scooter across Canada to bring awareness to the dog meat trade in Asia

Couple found dead along northern B.C. highway in double homicide

Woman from the U.S. and man from Australia found dead near Liard Hot Springs

Injured fawn at B.C. vet will be euthanized Friday night unless claimed by sanctuary

Gilbert the deer is currently being treated at West Kelowna’s Rose Valley Veterinary Hospital

Nanaimo-Opoly will let board game players deal Harbour City properties

Victoria’s Outset Media and Walmart Canada partner on local edition of popular game

BC Wildfire Service warns wet weather no reason to be complacent

Fire risk currently low for much of B.C. compared to same time over last two years.

Bank of Canada lowers qualifying rate used in mortgage stress tests

Home sales softened last year after the federal government introduced new stress test rules for uninsured mortgages

Port Hardy RCMP cleared in arrest that left man with broken ribs, punctured lung: IIO

The IIO noted the matter will not be referred to crown counsel for consideration of charges.

B.C. man pleads guilty in snake venom death of toddler

Plea comes more than five years after the incident in North Vancouver

Trudeau says Ottawa open to proposals for B.C. refinery as gas prices soar

Prime minister says he knows B.C. residents are struggling and the federal government is open to ideas

Most Read