Artist’s rendering of The Exchange, a mass timber commercial-industrial-office project in Kelowna to be completed in late 2023. (Faction Projects Inc.)

Artist’s rendering of The Exchange, a mass timber commercial-industrial-office project in Kelowna to be completed in late 2023. (Faction Projects Inc.)

B.C. funds 12 mass-timber research and development projects

Saanich fire station, Kelowna commercial building included

The B.C. government is putting $4.2 million into a dozen mass timber research and demonstration projects to advance the technology and its use with steel and concrete for hybrid buildings.

Projects include a new fire station in Saanich, which gets $500,000 to help create a “post-disaster” building to function after an earthquake or other emergency, and $137,000 toward a four-storey mixed-use commercial and industrial building in Kelowna to demonstrate the feasibility of using local trades for advanced wood construction technology.

Other projects funded include a 21-storey rental building in Vancouver using mass timber along with steel and concrete, a six-storey headquarters for the First Nations Health Authority in North Vancouver, and a 10-storey office building in Vancouver’s False Creek Flats with a honeycomb exterior to demonstrate its perimeter-braced seismic system.

“Mass timber is good for forestry-dependent communities, workers and the environment because it adds value rather than just volume,” Premier John Horgan said when the project was announced April 7. “That’s why growing the sector is key to building a strong and sustainable economic recovery that reaches everyone.”

The federal and provincial governments have been promoting mass timber construction in Asia for many years, promoting its earthquake resistance, low carbon footprint compared to concrete and the ability to pre-fabricate components and assemble them rapidly on site. A key focus is fire resistance, and one of the research projects is mass timber demonstration fire tests. B.C. is contributing $300,000 to the project with Natural Resources Canada and other provincial governments, through the Canada Wood Council.

Jobs Minister Ravi Kahlon said using the technology for an emergency building is a step forward for a construction technique that in its early days was not supported by firefighters. Other research is to show cost advantages and deal with building codes.

“If you look at the four research projects that we’re funding, obviously the fire safety piece is one where we want to continue to educate the public that this is actually safe,” Kahlon said.

The demonstration projects are selected to advance the glue-laminated and cross-laminated technology that was first developed by Structurlam in the Okanagan, and has spread around the world. The 21-storey tower in Vancouver, being developed by international high-rise developer Westbank, “puts us right back as a leader in the world again” for tall wood construction, Kahlon said.

The mass timber demonstration program is run by Forest Innovation Investment, an industry-government partnership to develop forest industry technology. It is based at the University of B.C., where the 18-storey Brock Commons student residence was one of the pioneers of tall wood construction.

RELATED: B.C. trade ‘micro-credentials’ include mass timber training

RELATED: Structurlam, Okanagan resort win awards for wood design


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC politicsforestry

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

B.C. Centre for Disease Control maps showing new COVID-19 cases by local health area for the week of April 4-10. (BCCDC image)
Parksville-Qualicum passes Nanaimo in new COVID-19 cases

Greater Victoria had more new cases than any other Island area: B.C. Centre for Disease Control

Restaurant operators like Canteen on the Green’s Julie Stevens are serving up food outside these days or offering takeout. (Photo by Don Bodger)
High job numbers seem overly rosy

Hard to believe there’s so much more employment in hardest hit sectors

Addition of greenery, tables and benches looks good along Chemainus Road. (Photo by Don Bodger)
Finishing touches down to the nitty gritty on Chemainus Road

Just a few minor adjustments yet to be made on extensive project

Chemainus Art Group creates mural mosaic to celebrate a joyful spring. (Photo submitted)
Art group members celebrate a joyful spring in Chemainus

Each of 33 squares pushed together into one mural

Savanah Sanchez with a likeness of herself in a Canucks’ uniform done by her mom Jessica. (Photo by Don Bodger)
Girl’s passion for hockey knows no bounds

No games, but extensive ice time for training beneficial to Sanchez

A woman wears a protective face covering to help prevent the spread of COVID-19 as she walks past the emergency entrance of Vancouver General Hospital in Vancouver, B.C., Friday, April 9, 2021. COVID-19 cases have been on a steady increase in the province of British Columbia over the past week. THE CANADIAN PRESS/Jonathan Hayward
Top doctor warns B.C.’s daily cases could reach 3,000 as COVID hospitalizations surge

There are more than 400 people in hospital, with 125 of them in ICU

The father of Aaliyah Rosa planted a tree and laid a plaque in her memory in 2018. (Langley Advance Times files)
Final witness will extend Langley child murder trial into May or June

Lengthy trial began last autumn with COVID and other factors forcing it to take longer than expected

The corner of 96th Avenue and Glover Road in Fort Langley now has traffic signals, and new “touchless” signal activation buttons. (Matthew Claxton/Langley Advance Times)
Busy Fort Langley intersection gets ‘touchless’ crosswalk signals

The new traffic light started operation in April

Cannabis bought in British Columbia (Ashley Wadhwani/Black Press Media)
Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

A crossing guard stops traffic as students wearing face masks to curb the spread of COVID-19 arrive at Ecole Woodward Hill Elementary School, in Surrey, B.C., on Tuesday, February 23, 2021. A number of schools in the Fraser Health region, including Woodward Hill, have reported cases of the B.1.7.7 COVID-19 variant first detected in the U.K. THE CANADIAN PRESS/Darryl Dyck
COVID-infected students in Lower Mainland schools transmitting to 1 to 2 others: data

Eight to 13 per cent of COVID cases among students in the Lower Mainland were acquired in schools, B.C. says

An armed officer walks outside Cerwydden Care on Cowichan Lake Road near Skinner Road Wednesday, April 14 around 5:30 p.m. (Kevin Rothbauer/Citizen)
Police standoff at Duncan apartment ends peacefully

Officers surround building as homeowner held in apartment for nearly four hours by adult son

Norm Scott, president of Royal Canadian Legion Branch # 91, is disappointed the Legion does not qualify for COVID financial assistance from the provincial government. (Black Press Media file photo)
B.C.’s pandemic aid package passing Legion branches by

Federal non-profit status stymies provincial assistance eligibility

Latest modelling by public health shows cases generated by COVID-19 infections into places where it can spread quickly. (B.C. Centre for Disease Control)
Industrial sites, pubs, restaurants driving COVID-19 spread in B.C.

Infection risk higher in offices, retail, warehouses, farms

Most Read